
Project Overview
Challenges
Solutions
Results
Renovation to a main campus hub to bring the facility up to current ADA compliance standards and to improve the cinema experience. Included extensive demolition and saw cutting of existing structural elements, as well as extensive excavation and dewatering for a new LULA lift foundation. The cinema was updated with new seating, acoustical paneling, upgraded AV system, and new theatrical lighting.
Working within an active campus hub and collaboration space; repurposing significant building features into the new space
Close coordination with user groups; special protective measures; self-performing key scopes and coordinating several trades within same space
The iconic teak slats were beautifully integrated into the new design and the updated campus hub was open to students and faculty on time.
Institutional
Harvard University
Cambridge
EYP
13,100 SF
Occupied Renovation, Library, Classroom, Auditorium

Confidential Client

Boston University

Watts Water Technologies







