Project Overview
Challenges
Solutions
Results
Extremely complex and technical MRI replacement project including installation of new MEP systems in the floor below, as well as the installation of new rooftop equipment.
Located in active radiology department and above an active ambulance bay; Removal and installation of MRI machines required closure of main entrance; required removal of old steel and shielding and replacement with newer, more advanced RF product
Robust logistical plan and close coordination with hospital team; Wise, the design team and BCH toured MRI suites in Boston to investigate materials and installation options
Throughout construction, there were no interruptions to the regular radiology department patient flow.