What mechanical infrastructure is required to transform 25,000 SF of office space into a new Ambulatory Surgery Center with six operating rooms and 21 pre/post-operative bays? More than 50,000 pounds of new rooftop HVAC, seven condensers, a generator and docking station, a RODI Skid System, and more.
Currently taking shape in Waltham, MA, Wise and project partners are constructing a new Ambulatory Surgery Center that will feature six operating rooms, 21 pre/post-operative bays, dedicated waiting and reception areas, and a sterile processing department with separate spaces for decontamination, clean work, and sterile storage. With the surgical side of the facility requiring strict environmental controls, the project calls for two new rooftop units (RTUs), each designed to serve different sections of the space.
One RTU will serve the operating rooms, sterile storage, and locker rooms, while the second will support the reception, waiting, and pre/post-operative areas. Accommodating these larger, heavier units required modifications to the building’s existing rooftop dunnage system to provide the necessary structural support.
Due to the size of the RTUs, they both arrived in two sections. The individual pieces ranged from 5,200 pounds to 22,200 pounds, with the four sections totaling more than 50,000 pounds. Once the four pieces were assembled on the roof, the team completed the pick with seven additional condensers.
With significant loads being lifted above an active construction site, safety and communication were central to the operation. A detailed crane pick plan was developed so Wise, trade partners, and the design team could coordinate with existing building tenants and deliver a safe installation. On the day of the pick, Wise worked closely with the crews above and below the roof, using two-way radios to communicate throughout the operation. Interior work beneath the lift areas was suspended, and personnel remained clear of suspended loads.
Beyond the rooftop installation, the ASC renovation includes additional infrastructure to support the new facility. A generator and docking station require a new concrete pad and curb system, along with a retaining wall designed to accommodate existing site conditions. The project also includes a reverse osmosis deionized (RODI) water system to supply purified water to specialty equipment. At the main entrance, a new canopy will be supported by additional foundations and piers. With support from Baystate, Johnson Sheet Metal, Shaughnessy, and Wise’s self-performing carpenters and laborers, the team successfully completed the rooftop installation, marking an important milestone in the development of the new Ambulatory Surgery Center.